Business Details
13 Years
experience
Expert Construction Drying Solutions in Oxfordshire
Established in 2013, ForceDry has become the UK's leading provider of advanced screed drying solutions and portable boiler hire. Our specialist three-component system optimises drying times, improves efficiency, and ensures quality control on construction sites nationwide. We deliver the Force Dry Programme, reducing drying times by over 40 days compared to natural methods, achieving fully dry screed in as little as 21 days. Our independent screed testing services provide precise status reports and tailored moisture management solutions, ensuring compliance with British Standards (BS EN 1264:2021) and manufacturer specifications. With a fleet of mobile trolley boilers, electric heaters, industrial dehumidifiers, and heavy-duty fans, we create optimal on-site conditions even in winter, preventing weather-related delays.Our team's extensive industry experience, including director Ross Verity's plumbing background, enables us to address construction challenges with innovative solutions. We maintain Constructionline Gold accreditation, CHAS certification, and membership in the Flowing Screeds Association and Supply Chain Sustainability School, demonstrating our commitment to health and safety, environmental compliance, and sustainable practices. Our case studies with major contractors like Wates and Kier demonstrate our capability to handle complex projects, including luxury residential developments and historic building renovations.
Services
Force Dry Programme
Screed Testing
Rental Products
Commissioning & Conditioning
Temporary Heat Solutions
Moisture Management
Thermal Imaging
Environmental Controls
Portable Boiler Hire
Dehumidifier Rental
Details
- Year established: 2013
Highlights and features
- Achieve fully dry screed in 21 days with our patented drying system
- Ensure 100% compliance with British Standards through independent testing
- Access top-specification portable equipment for all construction phases
- Benefit from 10+ years' experience in construction drying solutions
- Work with CHAS-certified professionals committed to health and safety
Associations and certifications
- Constructionline Gold
- CHAS
- Flowing Screeds Association
- Supply Chain Sustainability School
Services
Force Dry Programme
Our patented 21-day force drying system accelerates screed drying by 75% compared to natural methods. Using electric boilers, industrial dehumidifiers, and air-moving fans, we create controlled conditions that ensure full compliance with British Standards. This process eliminates moisture-related floor failures while working independently of first or second-fix plumbing.
Screed Testing
As the UK's leading independent screed testing company, we use surface and invasive testing methods to measure relative humidity levels. Our thermal imaging service maps underfloor heating pipework, providing critical data to prevent costly floor failures. Test results come with tailored action plans to resolve moisture issues.
Rental Products
We offer high-specification equipment hire including portable electric boilers, industrial dehumidifiers, heavy-duty fans, and space heaters. Our mobile, wheel-mounted units operate on limited power without requiring plumbing connections. These versatile systems create optimal working conditions for trades and protect materials from damp conditions.
Commissioning & Conditioning
Our specialist equipment gradually heats and cools screed to prevent thermal shock. This process minimises cracking, curling, and de-bonding risks while meeting BS8204-7 standards. We provide full documentation to validate flooring warranties and include this as part of our comprehensive quality assurance programme.
Temporary Heat Solutions
Our three-component system maintains consistent temperatures and humidity levels on construction sites. Using electric boilers, dehumidifiers, and fans, we protect materials and equipment from cold weather damage. This enables year-round operation and early commissioning of underfloor heating systems without requiring central power infrastructure.
People
Ross Verity
Director
Qualified plumber with 15+ years' construction industry experience. Developed ForceDry's innovative drying system after identifying screed drying challenges. Holds technical expertise in mobile boiler systems and moisture management solutions.
Questions
How does ForceDry's 21-day drying programme work?
Our three-component system uses electric boilers to heat screed, dehumidifiers to extract moisture, and industrial fans to circulate air. This controlled process achieves full drying in 21 days regardless of seasonal conditions.
Why is professional screed testing necessary?
Testing prevents costly floor failures by measuring moisture levels before installation. Our surface and invasive tests ensure compliance with British Standards and manufacturer requirements for underfloor heating systems.
Can ForceDry equipment operate without plumbing?
Yes, our portable electric boilers and dehumidifiers work independently of first or second-fix plumbing. This allows immediate drying commencement and operation in unfinished buildings.
What accreditations does ForceDry hold?
We maintain Constructionline Gold accreditation, CHAS certification, and membership in the Flowing Screeds Association and Supply Chain Sustainability School for health, safety, and environmental compliance.
How does ForceDry handle winter construction challenges?
Our temporary heating systems create ambient working conditions and protect materials from cold weather damage. Equipment operates effectively even when external temperatures drop below freezing point.