Business Details
8 Years
experience
Modular Scaffolding Systems for Safe Working at Height
At Safe Deck Access, we prioritise workplace safety by providing innovative modular scaffolding systems designed to protect workers at height. Our SAFE DECK injection-moulded panels offer a slip-free, load-bearing platform with a safe working load of 200kg per m, exceeding UK Health and Safety Executive (HSE) regulations. The systems dual locking pin mechanism ensures secure installation while allowing visibility to confirm correct engagement. Designed for efficiency, our lightweight panels are available in three sizes (1m x 1m, 1m x 750mm, and 1m x 500mm), enabling rapid assembly and dismantling at up to 60m per hourthree times faster than traditional birdcage scaffolding. The platforms versatility accommodates internal blockwork, floor joists, and roof trusses without requiring adjustments.Compliant with BS EN 12811-1 Part 3 standards, our solution eliminates fall risks while reducing labour costs. We serve residential and commercial new-build projects across the UK, combining technical expertise with rigorous testing to deliver reliable safety infrastructure. Our commitment to innovation ensures compatibility with tube-and-fitting scaffolding for access to peaks and party walls. Founded in 2018, we leverage industry experience to provide tailored solutions that align with HSE Work at Height Regulations (2005). Our team supports clients nationwide through expert guidance, ensuring compliance with evolving safety mandates such as the HSEs Fee for Intervention scheme.
Services
Modular Scaffolding Systems
Fall Protection Solutions
Non-Slip Platforms
HSE Compliance Services
Panel Installation
Details
- Year established: 2018
Highlights and features
- Our panels support 200kg per m, matching traditional scaffolding load capacity.
- Erect 60m per hourthree times faster than conventional birdcage systems.
- Dual locking pins ensure visible confirmation of secure installation.
- Compliant with BS EN 12811-1 and HSE Work at Height Regulations (2005).
- Suitable for all room configurations without requiring platform adjustments.
Associations and certifications
- BS EN 12811-1
- UK Health and Safety Executive (HSE)
Services
Modular Scaffolding Systems
SafeDecks modular scaffolding systems provide a reusable, load-bearing platform with a safe working load of 200kg per m. The injection-moulded panels feature dual locking pins for secure installation and visible confirmation. Designed for rapid assembly, they reduce labour time by 60% compared to traditional methods while complying with HSE standards.
Fall Protection Solutions
Our fall protection systems integrate non-slip surfaces and internal fall protection mechanisms to eliminate risks during work at height. The platforms design exceeds HSE Work at Height Regulations (2005) requirements, ensuring compliance and worker safety on residential and commercial sites.
HSE Compliance Services
We ensure all systems meet BS EN 12811-1 Part 3 standards and HSE guidelines, including the Work at Height Regulations (2005). Our solutions help employers avoid penalties under the HSEs Fee for Intervention scheme by maintaining rigorous safety protocols.
Panel Installation
Our lightweight panels are installed quickly without requiring adjustments for internal blockwork, floor joists, or roof trusses. The system allows tube-and-fitting scaffolding to be built through it, enabling access to peaks and party walls with minimal disruption.
Non-Slip Platforms
The non-slip surface of SafeDeck panels ensures secure footing for workers, reducing fall risks. The platforms durability and compliance with HSE standards make it ideal for both residential and commercial construction projects requiring reliable safety infrastructure.
Questions
What is SafeDeck Access’s core product?
Our core product is a modular scaffolding system with injection-moulded panels designed to provide a slip-free, load-bearing platform for safe working at height.
How does SafeDeck comply with HSE regulations?
SafeDeck meets BS EN 12811-1 standards and HSE Work at Height Regulations (2005), featuring dual locking pins and non-slip surfaces to prevent falls.
Can SafeDeck panels be reused?
Yes, our lightweight panels are reusable and compatible with tube-and-fitting scaffolding for versatile project applications.
What sizes are SafeDeck panels available in?
Panels are available in 1m x 1m, 1m x 750mm, and 1m x 500mm sizes to suit all room configurations.
How quickly can SafeDeck systems be installed?
SafeDeck panels can be erected or dismantled at up to 60m² per hour—three times faster than traditional birdcage scaffolding.
Does SafeDeck offer nationwide service?
Yes, we supply and install our systems across the UK for residential and commercial construction projects.